Kukkula Winery
2010

Paso Robles, CA

Client
Kevin Jussila

Architect
Studio B Architects
Aspen, CO

Design Principals
Scott Lindenau

Project Architect/Manager
Joseph Spears

Structural Engineer
Taylor + Syfan Consulting Engineers

Contractor
US Building + Development

Steel Fabrication/Erection
Allied Steel

Site Area
88 acres

Building Area
5,000 sf + 995 sf tasting room

Photographs
Derek Skalko

View of winery from residence

What were the circumstances of receiving the commission for this project?

The client commissioned us to complete his house after seeing our firm published in a national magazine. After successfully completing the residence, we started design on the winery building.

North elevation

Can you describe your design process for the building?

After gaining a great knowledge of the site and wine making in the area we completed three options to study. After adopting a diagram and direction we worked through design drawings and computer rendering to complete the final building.

View of tasting room at southwest corner of building

How does the completed building compare to the project as designed? Were there any dramatic changes between the two and/or lessons learned during construction?

Early in the project's design we worked closely with the client, steel subcontractor and others to ensure the final project was very close to the design. The final building very much meets our design intent.

Site plan showing relationship of residence and winery

How does the building compare to other projects in your office, be it the same or other building types?

Like all our projects at Studio B, this project is rooted in a strong modern aesthetic, minimalist design, and elegant site integration.

Floor plans

How does the building relate to contemporary architectural trends, be it sustainability, technology, etc.?

To minimize temperature swings the building was set into the hillside, and rocks from the site were set in baskets (gabions) on the front façade to absorb heat during the day to be release that heat at night. All the exterior materials are low maintenance and simply detailed.

East-west building section looking south

Are there any new/upcoming projects in your office that this building’s design and construction has influenced?

The materials used have influenced many of our projects. The simple and inexpensive steel design shows that interesting things can happen with standard steel construction.

Email interview conducted by John Hill

Kukkula Winery
2010

Paso Robles, CA

Client
Kevin Jussila

Architect
Studio B Architects
Aspen, CO

Design Principals
Scott Lindenau

Project Architect/Manager
Joseph Spears

Structural Engineer
Taylor + Syfan Consulting Engineers

Contractor
US Building + Development

Steel Fabrication/Erection
Allied Steel

Site Area
88 acres

Building Area
5,000 sf + 995 sf tasting room

Photographs
Derek Skalko

Related articles

Other articles in this category