Photo © Thomas Telley
Photo © Thomas Telley
Photo © Thomas Telley
Photo © Thomas Telley
Photo © Thomas Telley
Photo © Thomas Telley
Photo © Thomas Telley
Photo © Thomas Telley
Drawing © APArchitectes
Drawing © APArchitectes
Drawing © APArchitectes

Reconstruction of a Semi-Detached House

 Back to Projects list
Location
Môtier, Switzerland
Year
2022

Just a stone's throw from the shores of Lake Morat, the volume of this new house respects the imposed dimensions and takes up the volume of the existing semi-detached house. The overall silhouette of the building and the profile of the roof blend harmoniously into the existing built environment, while using a contemporary language.

The construction system of four rigid frames connected horizontally through the floor slab is clearly visible on the façade and defines the framework of the house. For ease and speed of execution, all the elements were prefabricated in the workshop and then assembled on site.

Other Projects by Atelier Pulver Architectes SA

Conversion of a House and its Barn
Switzerland
Courtepin Primary School
Courtepin, Switzerland
Furniture for a Nautical Centre
Sugiez, Switzerland
New Kindergarten in Renens
Renens, Switzerland
New Primary School in Sorens
Sorens, Switzerland