Lobby
Foto © Fantomas
Light Installation
Foto © Fantomas
Reception Desk
Foto © Fantomas

Office Building Oskar

 Volver a la lista de Proyectos
Ubicación
Oskar-von-Miller-Ring 20, 80333 Munich, Alemania
Año
2018
Cliente
Hines
Equipo
Arnold / Werner Architekten
Signaletics and Light Installation
Fantomas

In 2018, A/W redesigned all the public areas at Siemens Headquarters, originally built in 1999 by Richard Meier. The round, 8-metre-high entrance hall now serves as a reception and lobby. The reception desk made of solid Italian Carrara marble and a blue-and-grey-coloured carpet are positioned in the centre of the lobby. Directly above and framed by floor-to-ceiling curtains is a light installation almost 10 metres in diameter with 1,200 stainless-steel interactive LED rods from the design agency Fantomas.

Otros proyectos de Arnold / Werner

Wohnung Reitmorstraße
München, Alemania
Bungalow Germering
München, Alemania
Fantomas Design
München, Alemania
Penthouse Maxvorstadt
München, Alemania
Haus A/Z
Alemania