照片 © Casey Dunn
照片 © Casey Dunn
照片 © Casey Dunn
照片 © Casey Dunn
照片 © Casey Dunn
照片 © Casey Dunn
照片 © Casey Dunn
照片 © Casey Dunn
照片 © Casey Dunn
照片 © Casey Dunn
照片 © Casey Dunn
照片 © Casey Dunn
照片 © Casey Dunn
照片 © Casey Dunn

Saxum Vineyard Equipment Barn

 回到项目列表
位置
Paso Robles, 美國
年份
2018
客户
Saxum Vineyards
团队
SSG Structural Engineering (structural engineering), Rarig Construction (contractor), Pacific Energy (solar basis of design), Clayton Korte (architecture & lighting design)

Located in the Templeton Gap area of West Paso Robles, this simple agricultural storage structure rests at the toes of the 50 acre James Berry Vineyard. Designed as a modern pole barn, the reclaimed oil field pipe structure’s primary objectives are to provide an armature for a photovoltaic roof to reduce the purchase of electric energy for the adjacent Saxum Winery, collect rainfall for irrigating trees and adjacent grazing meadow, as well as to provide workshop space and covered storage for farming vehicles, implements, and livestock supplies. The photovoltaic system is designed to produce roughly 88,700 kWh per year, with the capacity to take Saxum Winery and the vineyard irrigation wells off-grid.

以下出品方的其他项目 Clayton Korte

Eberly
Austin, 美國
Southerleigh
San Antonio, 美國
Fernwood Residence
Bethesda, 美國
Savor
San Antonio, 美國
Herrera Law Office
Austin, 美國