OMV

Schwechat, Austria
The new OMV Office Building.
Photo © ATP/Kuball
The central and generously designed foyer.
Photo © ATP/Kuball
The calm internal courtyards open up a range of perspectives and optimize the illumination of the spaces.
Photo © ATP/Kuball
Architects
ATP architects engineers
Location
Schwechat, Austria
Year
2018
Client
OMV Refining und Marketing GmbH
Competition
2015, 1st prize
Project leader
Birgit Reiterer
Gross built area
12,932 m²

Following ATP Vienna’s success in a design competition and a planning phase lasting 14 months, the construction of OMV’s new office building started in October 2016. The building’s state-of-the-art energy concept which was developed by ATP sustain includes the supply of energy from the OMV steam network.

In urban planning terms, the building marks the entrance to the refinery complex. It is conceived as an ensemble of four interwoven bridge-like buildings, parts of which float like a sculpture over an existing bunker complex. The dynamic, sloping, sculptural forms of the load-bearing pillars combine in an open, generous gesture to create a dramatic reception space with very special aesthetic qualities.

“In the future, the new OMV office building will be perceived as the first modern building with high-quality architecture that welcomes the people of and visitors to Vienna as they drive from the airport to the city center” reports ATP’s Project Leader, the architect Birgit Reiterer, with a sense of pride.

Clearly visible from the Schwechat motorway intersection the building responds to the notion of speed and the fascination with “mobility”. The deep multi-colored reveals of the façade ensure that it is experienced very differently from different perspectives.

With a gross floor area of around 13,000 square meters the building offers space for around 300 employees. Arranged around two green “oases”, the offices and meeting rooms offer an excellent user experience.

ATP’s structural engineers ensured that the 65x75 meter building is largely free of columns and offers appropriately flexible spaces for a range of functions. A single central lift core acts as the vertical link between all building volumes and functional areas.

Client
OMV Refining und Marketing GmbH

Competition
2015, 1. Preis

Total Built Area
ca. 12.932 qm

Total Built Volume
ca. 54.745 m³

Construction Period
2016-2017

Related Projects

  • Gebäudeadaptierungen Rathausbereich - Zwentendorf
    maul-architekten zt gmbh
  • FON - Housing and Kindergarten Fontanastrasse
    GERNER GERNER PLUS
  • GOLD - Housing Goldberg
    GERNER GERNER PLUS
  • BENE - Housing Benedikt
    GERNER GERNER PLUS
  • PUCH - Housing Puchsbaumgasse
    GERNER GERNER PLUS

Magazine

Other Projects by ATP architekten ingenieure

Seminar and distribution center for Viega
Attersee, Austria
SVS Headquarters Refurbishment
Vienna, Austria
magdas
Wien, Austria
Technologiezentrum Seestadt
Vienna, Austria
IN Tower
Ingolstadt, Germany