Laird Norton Addition at the Winona County History Center

19. 9月 2011

Laird Norton Addition
at the Winona County History Center
2010

Winona, MN

Client
Winona County Historical Society

Architect
HGA Architects and Engineers
Los Angeles

Design Principal
Jim Goblirsch, AIA, LEED AP

Project Architect
John Cook, FAIA

Project Lead Designer
Joan M Soranno, FAIA

Project Manager
Jim Goblirsch, AIA, LEED AP

Project Team
Nicholas Potts, AIA
Michael Koch, AIA
Robert Johnson Miller

Structural Engineer
Sarah Jorczak, PE

MEP/FP Engineer
Ed Clements, PE, LEED AP

Electrical Engineer
Ben Gutierrez

Civil Engineer
Kenny Horns, PE, LEED AP

Landscape Architect
HGA Architects and Engineers

Lighting Designer
Tao Ham, PhD, LC, LEED AP, IESNA

Graphic Designer /
Environmental

Graphics Gretta Fry

Contractor
Alvin E. Benike, Inc.

Site Area
12,400 GSF

Photos
Paul Crosby Photography

View of façade along street

Can you describe your design process for the building?

Our process is guided by intense research and the exploration of design issues through models; for Winona, we worked iteratively across scales and media during the design phases as we studied the project’s potential formal, spatial, and material expressions. The small infill site and its charged historical context were both a constraint and inspiration, and we paid considerable attention to make sure the new addition was proportionally and materially conversant with the existing Armory. The client was also an invaluable resource throughout the design phases, especially in helping to source reclaimed materials from the region to use in the interior finishes.

Interior view of new lobby and existing Armory wall

How does the completed building compare to the project as designed? Were there any dramatic changes between the two and/or lessons learned during construction?

The development of design details through mockups is an integral part of our studio’s design process. The street-level colonnade in particular evolved during construction as we worked with the contractor and suppliers to develop an innovative system that seamlessly coordinated a custom rear-glazed curtain wall with precast and masonry components.

Detail of brick colonnade

How does the building compare to other projects in your office, be it the same or other building types?

Our studio sees each project as a unique expression of purpose, program, and site. Though our focus is in museum and sacred typologies, the history and context that we drew inspiration from on the Winona County History Center engendered a truly unique response.

Site plan

How does the building relate to contemporary architectural trends, be it sustainability, technology, etc.?

The client wanted a signature contemporary building that reflected our own era much as Winona’s signature historic buildings had in their own time. Rather than drawn on stylistic pastiche, the design of the addition takes cues from the materiality of its context and reinterprets them in a way that clearly reflects the building technologies and aesthetic values of our own time.

E-Mail Interview conducted by John Hill

Floor plans
Colonnade section and detail

Laird Norton Addition
at the Winona County History Center
2010

Winona, MN

Client
Winona County Historical Society

Architect
HGA Architects and Engineers
Los Angeles

Design Principal
Jim Goblirsch, AIA, LEED AP

Project Architect
John Cook, FAIA

Project Lead Designer
Joan M Soranno, FAIA

Project Manager
Jim Goblirsch, AIA, LEED AP

Project Team
Nicholas Potts, AIA
Michael Koch, AIA
Robert Johnson Miller

Structural Engineer
Sarah Jorczak, PE

MEP/FP Engineer
Ed Clements, PE, LEED AP

Electrical Engineer
Ben Gutierrez

Civil Engineer
Kenny Horns, PE, LEED AP

Landscape Architect
HGA Architects and Engineers

Lighting Designer
Tao Ham, PhD, LC, LEED AP, IESNA

Graphic Designer /
Environmental

Graphics Gretta Fry

Contractor
Alvin E. Benike, Inc.

Site Area
12,400 GSF

Photos
Paul Crosby Photography

関連した記事

このカテゴリ内の他の記事